how much quantity a skilled labour and unskilled does Pcc
per day, if ratio is(1:2:4)

Answers were Sorted based on User's Feedback



how much quantity a skilled labour and unskilled does Pcc per day, if ratio is(1:2:4)..

Answer / jitender kumar mishra

you mixing the mixer machine or baching plant

Is This Answer Correct ?    3 Yes 1 No

how much quantity a skilled labour and unskilled does Pcc per day, if ratio is(1:2:4)..

Answer / akbar khan

if you tell about both in this context,it will be highly
appreciated.

Is This Answer Correct ?    0 Yes 0 No

how much quantity a skilled labour and unskilled does Pcc per day, if ratio is(1:2:4)..

Answer / vasanth

Skilled labour 1.5 m3, Un skilled .7m3

Is This Answer Correct ?    0 Yes 4 No

Post New Answer

More Civil Engineering Interview Questions

why demand factor less then 1 ?

0 Answers   Simplex,


what is formula for concrete mix ratio in m20, m25 and m30?

2 Answers   Reddy Veeranna Constructions,


how you calculate the data (all parameter) after transient response method i.e.pile intigrity test on pile.

1 Answers  


what are the changes in concrete pour height as per IS 456, 2009?

0 Answers  


What would be the quantity of cement:Sand:Aggregate (1:2:4) requirement for slab casting measuring 1mtr x 1mtr x 0.10 mtr (4 inches)?

1 Answers  






1- what is steel rebar cover? 2- what is a rebar stirrup?

1 Answers  


what is the soil bearing capacity for a 5 floor multistorey residential building and which type of soil ? what is plinth beam? in wall load calculation center to center column distance is considered or not/

0 Answers  


difference between ordinary portland cement concrete strength and pozzolona portland cement concrete strenth

5 Answers   NCC,


What is the proportion of M 45 grade of concrete

2 Answers   Payal Construction,


how much steel required for 1 sq.m area?

24 Answers   AA Architects, L&T,


VAT and CST ? Which benefits for buyer ? Why benefits?

0 Answers   L&T,


Providing cement based water proofing treatment to terrace (Indian water proofing) with brick bats with cement morter (1:5) and (1:3). what are rate in cum or sqm.

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)