Answer / rohit dhingra

cement volume = 70/1440 = 0.0486 cum
sand volume = 140/1600 = 0.08 cum
coarse aggregate = 280/1700 = 0.16 cum

Is This Answer Correct ?    13 Yes 1 No

if cement is 70 kg. sand is 140 kg and coarse aggregate is 280 kg. so what is volume of cement, san..

Answer / feedly24

i think this question was wrong,
bcoz those three material's unit weight is not equal
ie(cement 1440,sand 1600,C.A 1700).

Is This Answer Correct ?    9 Yes 1 No

if cement is 70 kg. sand is 140 kg and coarse aggregate is 280 kg. so what is volume of cement, san..

Answer / engr saleem mughal

cement=1.75cft sand=3.07 cft c agg=6.74 cft

Is This Answer Correct ?    7 Yes 2 No

Post New Answer

More Civil Engineering Interview Questions

is plate load test can be done on cohesive soils for immediate settlements ?

2 Answers   ONGC,


Steel calculation formala for column,beam and slab.

1 Answers   Coastal Projects,


What are some structures that are subjected to fatigue?

1 Answers  


The properties of concrete HA-30 and how does it differ with M 30 (specify the important characteristics like workability,strength,mix design,slump test value)and what is the standard relating to it

0 Answers  


What is the procedure of Waterproofing in toilet sunken area ?

2 Answers   ACIL,






what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.

0 Answers   L&T,


providing, fixing, removal of pockets of size 100*150*300mm to 500*600*1000mm for foundation. the shuttering material used for making &fixing of pockets shall be removed by the contractor without damaged to pockets. if any damage occurred, the same shall be rectified by the contractor is to handover the pockets to forge shop engineer with proper marking of centre lines, levels etc.

1 Answers  


why moment is create in fixed beam. And why moment is not create in simply support beam

4 Answers  


Why we do design mix of concrete when there is nominal method using the IS-Code available ?

14 Answers   Engineers India Limited,


Difine coffer dam ?

1 Answers  


How Can You Design Aisolated Footing Subjected To Tenstion Force?

0 Answers  


1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM

0 Answers   Civil Service, Intelinet, Marg, PMC,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)