Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


test procedure of fly ash bricks as per code

Answers were Sorted based on User's Feedback



test procedure of fly ash bricks as per code..

Answer / dvn potharaju

SO FAR NO CODE WAS DEVELOPED FOR FLY ASH BRICKS

BUT CAN BE DONE AS ORDINARY BRIBKS

Is This Answer Correct ?    2 Yes 6 No

test procedure of fly ash bricks as per code..

Answer / raghu

Indian Standard:

3812 (Part 1) : 2003.. ( For use as pozzolana in cement, cement mortar and concrete)..

Indian Standard:

3812 (Par 2): 2003..( For use as admixture in cement, cement mortar and concrete)..

Is This Answer Correct ?    2 Yes 9 No

Post New Answer

More Civil Engineering Interview Questions

WHAT IS THE IMPORTANCE OF FLY ASH BRICK?

2 Answers  


Calculation of Pier Cap with tapper area?

0 Answers  


100sqft of 9" (brickwork).. bricks(standard)=no ? sand= cement=

1 Answers  


How foundation is designed, Column design and beam design

0 Answers   College School Exams Tests, L&T,


1 cft concrete equal how many kgs

1 Answers  


can you give me the details of rate analysis of steel and concrete?

0 Answers   L&T,


How gate result to cube for 7 day? Formula for the cube testing?

1 Answers   Ambuja, Indiabulls, Legacy,


How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)

0 Answers   Sumadhura Infracon,


12 mm dia not available at site for raft, 10 mm are available at site how to calculate?

8 Answers  


How to do rate analysis for concrete work including shuttering work?

0 Answers   DBM, Techno Solutions,


Gidc technical que paper

0 Answers   GIDC,


I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)