How do you measure the centring work
Answers were Sorted based on User's Feedback
Answer / pramila raj
Centring is a type of falsework: the temporary structure upon which the stones of an arch or vault are laid during construction. Once the arch is complete, it supports itself, but until the keystone is inserted, it has no strength and needs the centring to keep the voussoirs in their
| Is This Answer Correct ? | 0 Yes | 2 No |
Answer / phani.a
If the quantity measured in Cum the quantity will be same as PCC & RCC items
| Is This Answer Correct ? | 0 Yes | 3 No |
Why does the pressure increase under soil?
Sir what reason the deshuttring of column 1 day after casting and slab deshuttring time 14 days after casting
In beams why the depth is > width
Can we use PPC AND PSC CEMENT FOR MIX DEIGN?
1 Answers IVRCL, Reward Constructions,
what is the painting co efficient of slope roof tiles?
What is grouting? Why it is done?
Which stone is best for wall construction Laterite Stone or Cement Blocks
It needs contour survey before plastering a wall / column & floor tiles setting to get––
why shear reinforcement is not provided in the design of footing?
How much cement & coarse sand is used in 1 Sqm plaster for ratio 1:4 of thickness 20 mm ?
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
how to calculate the amount of cement & sand required for plastering
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)