How do you measure the centring work
Answer Posted / phani.a
If the quantity measured in Cum the quantity will be same as PCC & RCC items
Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
What is difference between engineering stress and true stress?
how to determine the correctness of proportion used in cement mortor and various IS codes to determine the same?
Why is the use of granular sub-base in concrete carriageways not preferred, explain?
Which stone is best for wall construction Laterite Stone or Cement Blocks
Explain what are the phases inspections are done by local authority while construction?
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?
How to do base isolation for RC framed structure using ETABS software?
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
How much does the leaning tower of pisa lean?
How will you Engage Labours on Site?
How to find permissible diagonal tensile stress in reinforced brick work
In cement making,what is meaning of blend,fineness,density.
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
how to check and keep control on the wastage of material at site
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?