Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What is the max demand on your transformer and your company?

Answers were Sorted based on User's Feedback



What is the max demand on your transformer and your company?..

Answer / jatinder dhaliwal

max demand of a company and transformer is the maximum
power that his circuit is likely to draw at any time.

Is This Answer Correct ?    54 Yes 4 No

What is the max demand on your transformer and your company?..

Answer / mohd. karim

i want to give answer of this que. by an Example:

**if connected load of our system( factory,
Works,plant ...Etc) is 1250KW(1.25MW)...it means our maxi
demand at PF 0.83 is 1506KVA (1.506MVA)

one transformer used for this load with rating PF 0.8,
11kv/0.415, 1500kva
***it means MD in KW is 1200KW
MD in Kva is 1500KVA (1.5MVA)

it means this x-mer is not suitable for this load because
efficiency of x-mer is maxi. at half load. for above
example, this x-mer is suitable for 600KW-850KW at
PF=0.83)
Here
** is the MD of Company
***is the MD of X-mer

Is This Answer Correct ?    26 Yes 5 No

What is the max demand on your transformer and your company?..

Answer / pablo

The maximum demand of a power transdormer does not exceed
80 percent of its power rating.

Is This Answer Correct ?    19 Yes 6 No

What is the max demand on your transformer and your company?..

Answer / sp singh

Transformer generally selected 25% higher KVA than peak load of the organization.

Is This Answer Correct ?    5 Yes 0 No

What is the max demand on your transformer and your company?..

Answer / nagesh.patwari

Maximum Demand (kVA) is your peak demand of electricity from the grid. ... Your energy distribution company charges you for the maximum demand, so it costs you money. Maximum demand (MD) is the peak level of electricity demand recorded by TNB meter during a 30-minute interval in a month. The amount charged to a user is based on the recorded MD in kilowatt (kW) multiplied by the respective MD rate.

Company MD is sanctioned MD which you have to maintain to avoid penalty from Electricity Board

Is This Answer Correct ?    1 Yes 0 No

What is the max demand on your transformer and your company?..

Answer / naveenkumar m

The recorded maxdemand is the maximum demand of transformer

Is This Answer Correct ?    0 Yes 1 No

What is the max demand on your transformer and your company?..

Answer / gourav00

always 11kv rating power transformer use in my company..n almost 3 phase transformer use

Is This Answer Correct ?    0 Yes 5 No

What is the max demand on your transformer and your company?..

Answer / rajendran.m

750 kva.

Is This Answer Correct ?    6 Yes 13 No

What is the max demand on your transformer and your company?..

Answer / will

Maximum demand means that it shall not cross the 100%
rating of the transformer, if the transformer has no
colling stages and can take extra demand.
Normally the cooling stages increase the transformer
capacity to take load 33% more at eact cooling stage.
Ist cooling stage FA-1.33%
2nd cooling stage FA-1.66%

That means when the transformer getting loaded more than
100% capacity the ist cooling stage gets automatically on
and when it gets more than 133% loaded the second cooling
stage gets automatically on.

Is This Answer Correct ?    4 Yes 11 No

What is the max demand on your transformer and your company?..

Answer / stanley electrician

Consider that 500kva transformer in your company,
and you use only 250 kva load maximum. you must calculate
the increase of your load for the future five years.
That means, expecting 275 kva load in feuture, you will get
upto 300 kvaon maximum demand.

Simply get 25% extra from the maximum load.

Is This Answer Correct ?    5 Yes 13 No

Post New Answer

More Electrical Engineering Interview Questions

We know that, in case if there is a faulty insulation,or sc, the current is bypassed to earth through the earth wire that has low resistance.Actually, what will happen to that current that flows through gnd?In that case,if we come in contact with that faulty appliance, wont that current flow through us as we form a closed path by standing in gnd?Is grounding a safety measure?

3 Answers  


when we put inducter in neuteral grounding of genrator.

3 Answers  


What is the disadventage of gland earthing(power cable) if any. ?

0 Answers  


how speed control of induction motor?

4 Answers   DVC,


whether Transformer is singly excited or doubly excited machine?

2 Answers  


2 v/500amp/hr to 1.80vpc at 20 degree celsious 2v/5ooamp/hr to 1.75 vpc at 77degree farren .this is the capacity of a battery .what is the meaning of this . can i get a detailed explenation

0 Answers  


What is essential to prove safe isolation of electrical circuit?

0 Answers  


what is AB switch???

6 Answers   NTPC, Simplex,


What is BUCKBOOST TRANSFORMER and Operation of Buckboost transformer?

4 Answers   Voltamp,


HOW TO CALICULATE THE LEAD ACID BATTERY AH AND HOW TO FIND THE 1.2KVA UPS BACKUP @ 1000WATTS LOAD?

2 Answers  


what is speed of light?

8 Answers  


what is transformer

63 Answers   ABB, Advance Power Controls, CERC, Electrical, Electrical Supervisor Competency Certificate, ETA, IBM, Jindal,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)