What is the max demand on your transformer and your company?
Answer Posted / sp singh
Transformer generally selected 25% higher KVA than peak load of the organization.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.
How to apply 'c' license and also explain what is difference between 'c' and 'b'license.i am also working in one of the private company.i have finished my diploma in 2014 .i have already finished in ITI electrician course.....
Determine the BTU size of an aircon for 20 sq metre room
What is the difference between single point and double point bonding. please kindly detail about bonding of cables.
How to calculate LT XLPE CABLE for 11 kv / 433 v , 1000 kva oil type transformer system?
how to calculate the surge level of surge suppressors related to the SF6 cicuit breakers?
I'm looking for a softcopy manual set for a Credence ASL- 3000. Anyone know where I can get it?
how many joints are allowed in underground HT cable of 1 KM
how is the cable tray designed & how its total length is calculated for an Industrial plant Say for Ex. (500KW Motor Load)
what exactly commisioning work does in electrical site work... LT side?..
hi all i like to know vat is power plot in control systems also i want to know abt latest trends in electrical & electronics
Advantages/Disadvantages of earthing of neutral bus on MSB instead of separate neutral earthing for transformer/DG sets feeding to MSB
what is the effect of un-synchronized power.
How line capacitance & line inductance varies with increase in height tower.
our factory is going under construction mean time transformer 1000 kva 2 nos &load break swithch 12 kv & 4 nos 750 kva 2 nos & 380 kva 2 nos generator to be errcted.how to arrange earth pits &how to earth connect & neutral pit how to calculate in earth bit size.