Answer / kalpesh g patel
Commissioning is the process of assuring that all systems and components of a building or industrial plant are designed, installed, tested, operated, and maintained according to the operational requirements of the owner or final client. A commissioning process may be applied not only to new projects but also to existing units and systems subject to expansion, renovation or revamping.
In practice, the commissioning process comprises the integrated application of a set of engineering techniques and procedure to check, inspect and test every operational component of the project, from individual function, such as instrument and equipment, up to complex amalgamations such as modules, subsystems and systems.
Commissioning activities, in the broader sense, are applicable to all phases of the project, from the basic and detailed design, procurement, construction and assembly, until the final handover of the unit to the owner, including sometimes an assisted operation phase.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / kalpesh g patel
Commissioning is the start up of the equipment for the first time. It is when you run the equipment and carry out tests to verify it is running as intended i.e. to design specifications. Commissioning tests are normally run against a design data baseline. Commissioning also includes things like checking oil levels, fluid levels, temperatures, pressures and for general issues that are contradictory to the intended correct operation of the equipment.
| Is This Answer Correct ? | 0 Yes | 0 No |
Determine the manipulated variable, controlled variable, and the measured variable given a description of various typical industrial processes.
what is the PC interface and software for connection to ABB logic module “ LM011-CE18RAC “ ( for Programming ) ??
What is actuator what is motorized control valve?
What is a snubber circuit?
What is loop or pigtail in an impulse line?
8 Answers Qatar Airlines, Qatar Petroleums,
When doing a liquid seal on a differential flow transmitter , most of the time the sealing liquid will be heavier then the process fluid. For wich application will the sealing liquid be lighter than the process fluid if transmitter is mounted below the process line.
How to change dcs card in online. (Dsc is maxdna)
Can anybody explain what is the different between ESD & PLC
hello sir/madam, I,Subramanian need 5yrs placement papers of officer trainee of Instrumentation technology.pls send to this mail id mani_nxtgen@yahoo.co.in please do the needful. with regards, subramanian.v
How will you calibrate PID controller? explain with example.
0 Answers Jacobs, Sirte Oil Company,
we are having yokogawa centum cs3000 dcs in our power plant. i need some of the operator guides NOT to appear in HIS0163 AND HIS 0162 but it shoul appear in HIS0164 HOW TO DO IT?
in the flow caluclation k value how to caluclate.mass flow & volum flow.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)