what is commissioning & pre commissioning , explain with
difination
Answer Posted / kalpesh g patel
Commissioning is the start up of the equipment for the first time. It is when you run the equipment and carry out tests to verify it is running as intended i.e. to design specifications. Commissioning tests are normally run against a design data baseline. Commissioning also includes things like checking oil levels, fluid levels, temperatures, pressures and for general issues that are contradictory to the intended correct operation of the equipment.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How to check vortex flow meter is in good condition while we do not having calibration setup?
how many types of preheaters are in cement industry & what r they can any body explain?
I was working on calibrating turbidity transmitters endress+hauser at effluent polishing plant.We calibrated using NTU buffers.What happened is that when we immersed the sensor, everytime we raise and lower the sensor gradually, the reading will vary.my question is that is there any specifications on what is the required distance from the bottom of the container with buffer to the face of the sensor?Is it ok to install the sensor in a medium which has turbulence specially if bubbles are present?
Describe the functions of the Operator Interface including the considerations related to alarming and display layout/configuration/layers.
why we use 3 wire rtd direct wiring for temperature measurement instead of temperature transmitter like bearing temperature
What is Predictive Maintenance
What happen if I install my pressure transmitter below the elevation of pipe in natural gas service?
we want to control pump in let pressure and tank (for exp) our inlet line if water cam and pump will on and when our tank will full pump will off also if our inlet pressure low pump will off even tank not full.this pump i want to uses on our water supply line.
what is the difference between -24 : +24 & 0:24 and where it use?
Sir , i have completed my M.Sc In Instrumentation and presently working in Maintenance department 3 yrs Exp , is there is any possible for work in offshore ..
why we are using magnet for calibration of gas detector?
How will you test a transistor with a multimeter?
how will you check torque value during Factory acceptance Test for control valve/ESD ON/OFF VALE how will you confirm this torque value is being correct, Which document will you be refer.
I m appointed as an automation trainee engineer in small firm in that I am only the one , my company give me a project on s7-200 as i m beginner I don't know how to program so please send me the helpful site so that I complete my project before deadline....please help me out in this critical situation.
What is hp & mp seperator .& what is its working principle ?