what is commissioning & pre commissioning , explain with
difination
Answer Posted / kalpesh g patel
Commissioning is the process of assuring that all systems and components of a building or industrial plant are designed, installed, tested, operated, and maintained according to the operational requirements of the owner or final client. A commissioning process may be applied not only to new projects but also to existing units and systems subject to expansion, renovation or revamping.
In practice, the commissioning process comprises the integrated application of a set of engineering techniques and procedure to check, inspect and test every operational component of the project, from individual function, such as instrument and equipment, up to complex amalgamations such as modules, subsystems and systems.
Commissioning activities, in the broader sense, are applicable to all phases of the project, from the basic and detailed design, procurement, construction and assembly, until the final handover of the unit to the owner, including sometimes an assisted operation phase.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the use of temprature compensation?
what are the definitions of input, output, command & signal according to instruments controlled by PLC using DCS System?
i am preparing for BARC ,so plz mail me how to prepare for BARC. ALSO IF POSIBLE SOME RELATED QUESTIONS. MY MAIL ID IS khushi_4uall2003@yahoo.co.in
3. Differentiate between ultrasonic flowmeter and radar type flow meter.
what is the working principal of pribe
Explain types of valves?
give eg of how I/P is used in control loops
What is the working principle of the magnetic meter?
What are the key features of a Distributed Control System? describing the various layers (sensor through to business system interfaces) as well as the hardware, software and security aspects of the DCS.
What is the main difference between Cavitation and Flashing?
How to control flow variations in magnetic flow maters..... When i will provide proper earthing?
what deference between panel earth and systemearth
plz you help about Que paper of mahagenco previous your,any model paper relad to it{maharastra power genration}
why we use 3 wire rtd direct wiring for temperature measurement instead of temperature transmitter like bearing temperature
Draw a complete P&ID of a flow suction tank indicating all control & protection equipment. Indicate all its inlets and outlets. Explain the controls for this system