How to calculate the sand and aggregate in concrete
Answer Posted / naresh babu
for example M15 = 1:2:4
volume of wet cement concrete =1.54 to1.57m^3
so cement =1/1.57=0.63
sand= 2/1.57=1.27
concrete =4/1.57=2.54
| Is This Answer Correct ? | 2 Yes | 21 No |
Post New Answer View All Answers
Specific gravity of cement?
400 ku d/c clearess ketan hota hai?
usually hand broken stones are used for cement concrete 1:4:8 in foundation of single /two story houses with a view of economy in construction.what advantages it will give if you use machine crushed stone in place?
one steel fixers how much ton steel fabrication he will do same how much tone he will binding?
what is column foundation
How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)
what is the weight of 12mm aggregates?
procedure for preliminary selection of size of column of 5 storey building
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
what is civil engineer greatest strength and weakness?
What are the reasons for geotechnical site investigations in uganda?
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
IS code for grade of concrete for bamboo lintel????
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?