what is civil engineering?
Answer Posted / m. jahir hussain
TOTAL VOLUME
1000 X 4" = 330Cubfeet
330/35.28 = 9.35 cubmeter
SLAB CONCRETE RATIO 1:2:4
1.57/7 = 0.2242
0.2242 X 1440 =323 KG CEMENT/M3
BAG IS 6.45 BAG OR 6.5 BAGS/M3
OUR SLAB VOLUME IS 9.35M3
9.35 X 6.5 = 60.775 BAGS OR 61 BAGS
Is This Answer Correct ? | 8 Yes | 9 No |
Post New Answer View All Answers
What are the different softwares used for cad?
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you
Define current ucs?
how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar
what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?
What is the withdrawal force of steel nails?
indian standard split spoon sampler
please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)
Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.
what is the minimum reinforcement provided in beams,footings,slabs? what is the minimum soil bearing capacity to design a multistorey building
how to calibrate the RM 800
I am called for interview from north east power plant .so, I need some interview question which may help me.
sir, whitch is the best book (writer name) for prepration of gate....
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.
residential projects,structural.