at the beam-column junction point tell me how much beam bars
should pass through column ring ? 3 or 2 or 1 . answer with
reason. if it is not happen then what will be he effect ?
Answer / sjtbehera
ok look, there is no ring provided at the junction of
column and beam as per sp46 code. another thing what ever
rod obtain from design of the structure asll bar pass
through the column. please refer sp46 code for your
clearance.
Is This Answer Correct ? | 3 Yes | 3 No |
How many BRICKS required for 10 cumic of brickwork
How to calculate the dia of reinforcement when required (as per drawing) dia of reinforcement steel not available at site?
3 Answers MNC, N J Devani Builders, Simplex,
Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?
Minimum spacing of 2- bars in column, beam, slab
what is preposition of M-5 grade
3 Answers Montag Infrastructure,
How do we say The LAP LENGHT is 50D to 60D ?????
Why shear forces are usually neglected in column design?
how much need cement bags for block work of wall approx 1000 hollow blocks 20x20x40cm
how to calculate total cost for slab 35'×8'
WAS PUMP MODEL WXB DESIGNEDIN ACCORDING API 610 STANDARD?
WHAT IS MIS REPORT?
1m square 20mm plastering how much of water need curing work