Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how much current capacity 250 amp. mccb please tell me about
whats are the reasons to trip 2 or 3 times in a night. and
what are the steps to short out this problem



how much current capacity 250 amp. mccb please tell me about whats are the reasons to trip 2 or 3 ..

Answer / k.k dash

kindly see the breaking capacity of 250 amp mccb,if it trips more than two times kindly replace the mccb with new breaking capacity such as 25 ka, 35 ka,or 50 ka,so that it capable for taking the current

Is This Answer Correct ?    4 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

WHAT IS RMU AND WHAT IS ITS FUNCTION AND HOW TODISCONNECT

3 Answers   Bhel,


What is the meaning of dedicated earthing?

0 Answers   Dabur,


hi friends can u tell me name of the sites where i can get animation of electrical machines......

1 Answers  


what is the maximum current rating in india for home?

3 Answers  


what is the pressure in side transformer under normal condition?

1 Answers  


What is the basic difference between 90% stator earth fault and 100% stator earth fault, and its phenmenona?

4 Answers   Reliance,


What happen if transformer neutral path get removed ?

1 Answers  


why reactive power produce in generator? why inductive load absorbe reactive power?

2 Answers  


what is the purpose for open delta connection in potential transformer

2 Answers  


if a 3 point starter is not available, how can a dc motor be started?

3 Answers   Accenture, BIT, Techno Solutions,


what is the meaning of the HT LT transformer?

10 Answers   Sify,


What is the difference between Analogue Addressable Systems and intelligent Addressable Systems

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)