What should be the maximum allowable time for placing ready
mix concrete? The specification requires concrete placement
within 90 minutes of batching at the plant. What is the
significance of this 90 minutes & should this be used as a
rejection criterion? What effects does the concrete has
after that time period?
No Answer is Posted For this Question
Be the First to Post Answer
For a washout valve why are two gate valves required in normal practice?
how to calculate of m20 c.c road work 1cu.m
Which Types Of Bricks ?
How to calculate stirrups cutting length in columns
How long does it take concrete to harden?
how to calculate the strength rebound hammer test if average reading of 50.6,50.2,49.1,50.5,50.8,51.7 in grade M-60
why the cube depth is 150 mm which is used for testing
what"s the formula find the cement consumption for brick work 23 thick wall 1 m3?
7 Answers L&T, Vipul Chemicals,
what is the load bearing capacity of the scafolding pipe (50mm) and other.
Are you comfortable with formal design concepts in the home furnishings area?
How much quantity a carpenter can do in a day
how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)