What should be the maximum allowable time for placing ready
mix concrete? The specification requires concrete placement
within 90 minutes of batching at the plant. What is the
significance of this 90 minutes & should this be used as a
rejection criterion? What effects does the concrete has
after that time period?
No Answer is Posted For this Question
Be the First to Post Answer
What is passive earth pressure ?
What material should be used for casting the beam-column junction if beams and columns are of different grades?? For example concrete in beams and Columns is M20 and M25 respectively.
what is the name of software for designing of R.C.C.structures
What is Definition Of Refuse Area In Building ?
1 Answers Arpee Group, Dudhwala Builders,
What is the curing period for Epoxy grouts
What is the functional difference between DOME and R.C.C., where purpose of both covering roof?
What do you meant by gui?
What is allowable limit of silt in river sand for concrete
HOW MANY CEMENT BAGS ARE REQUIRED FOR 1m^2 PLASTERING AREA?
What is the Oneday Productivity for 1 Skilled Carpenter and 1 Steel fixer?
Types of column foundation and how to calculate its steel quantity.
How much cement ,steel bar, concrete ,required for 416 cum rcc slab
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)