What should be the maximum allowable time for placing ready
mix concrete? The specification requires concrete placement
within 90 minutes of batching at the plant. What is the
significance of this 90 minutes & should this be used as a
rejection criterion? What effects does the concrete has
after that time period?
No Answer is Posted For this Question
Be the First to Post Answer
What are the tests conducted on coarse aggregates ?
600 brass equal to how many cubic meter..
toothpaste is non-newtonian or newtonian
3. What are the disadvantages of your present job, things you do not like about it?
How to calculate the water content cement ratio
3 Answers Godway, Modern Construction Company,
How should i calculate Cutting length of haunch bar in a raft including cover?
material used for mendrel use to bend epoxy coated rebar
0 Answers Saudi Aramco Shell Refinery Company SASREF,
what is parametre for M25 after 7 days strength
how 2 find out slap steel quantity ? plz help me
What Are The Steps Involved In The Concreting Process, Explain?
what is SHEAR WALL ? why and where it is provided.
deshuttering time for RCC wall & column
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)