Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


why the cube depth is 150 mm which is used for testing



why the cube depth is 150 mm which is used for testing..

Answer / vinoth kannan

Basically, the force supplied by a concrete compression
machine is a definite value. For normal concrete strength
application, say below 50MPa, the stress produced by a
150mmx150mmx150mm cube is sufficient for the machine to
crush the concrete sample. However, if the designed concrete
strength is 100MPa, under the same force (about 2,000kN)
supplied by the machine, the stress under a
150mmx150mmx150mm cube is not sufficient to crush the
concrete cube. Therefore, 100mmx100mmx100mm concrete cubes
are used instead to increase the applied stress to crush the
concrete cubes

Is This Answer Correct ?    14 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

how many no of solid blocks and bricks required for construction of wall for 100 sqft?

14 Answers   Vipul,


whaat is blister in box girder bridge and what is its function..

0 Answers  


during site visit if i find voilation going on,what can i do,how i act?

3 Answers  


Manpower required for de shuttering of conccrete slab

1 Answers   Ameco,


Explain the different types of roofing systems?

0 Answers  


where we provide hinged joint in a framee structure ?

3 Answers  


How we calculate the cement for the M 15 normal concrete with aggregate size is 40 mm ?

5 Answers   Madhucon,


Any body please let me know how to prepare Method Statement for Bored Cast in situ piles.

4 Answers   Colliers International,


how to doing or how to prepare the or which things can be done on the site when construct the building?

1 Answers  


WAS PUMP MODEL WXB DESIGNEDIN ACCORDING API 610 STANDARD?

1 Answers  


brick size-230x110x75, how many no of bricks cover 1cubic meter.

5 Answers   GVL,


WHICH KIND OF ADDITIONAL PILE DRIVEN TO INCREASE THE CAPACITY OF SUPPORTING LOADS ON VERTICAL PILES

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)