Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


How calculate cable size & voltage drop for the following
requirement
connected load 150 KW distance cable length 1000 M voltage 3
phase 415 v.



How calculate cable size & voltage drop for the following requirement connected load 150 KW d..

Answer / kanishka verma

you have to use 3 core multistrand copper wire of 240 mmsq
with (silver coated),

amps= 150*1000/415*1.73
find the current capacity by cable size by chart,click the
link down here....
(http://www.miccomcables.com/Webrochure/Current%20Carrying%20Capacities%20&%20Other%20Technical%20Tables.pdf)

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

can we use CBCT in neutral of solidly grounded transformer? in place of three phases we can pass only one phase which decreases the size of CBCT?

0 Answers   UPSC,


differtiate between energy consevation and energy efficiency..

1 Answers   L&T,


what is consequences of neutral and earth connect?

0 Answers  


how can maintain the power factor and why and this is how do work tell us

0 Answers   Wipro,


what is transient earth voltage

2 Answers  


why the electrical insulators suspention breakdowen

2 Answers  


What is DG B-check and C-Check

1 Answers  


How can i modify the design of 3 phase induction motor to be as 3 phase synchronous motor??

2 Answers  


If a transformer primary winding operates at 240v, the secondary at 120v and the load is 1500w & the transformer is rated at 92% efficient, what's the current flowing through the primary winding of the transformer? What is the formula for finding this?

0 Answers  


help me with the question that might be ask on the interview for technical position

0 Answers   Eskom,


what difference between thermal and bi-metal over load relay?

2 Answers  


Why CT secondary should not be kept open?

7 Answers   Anna University,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)