Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


why transformers are put with supply for 24 hours before
giving supplying to a locality?

Answers were Sorted based on User's Feedback



why transformers are put with supply for 24 hours before giving supplying to a locality?..

Answer / vineet yadav

to avoid the harmonics mainly as during the starting due to the inrush currents "nd harmonic component is generated so to avoid it and give us the perfect supply we are doing this..
mainly to avoid the harmonics and different errors

Is This Answer Correct ?    2 Yes 1 No

why transformers are put with supply for 24 hours before giving supplying to a locality?..

Answer / aluko

it is to allowed the rush current to induce maximum flush in to the field for stability so that there will be not fluctuation in supply voltage to the locality due to in rush currents.

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Electrical Engineering Interview Questions

Can we use shunt trip coil instead of trip coil with protection relay for protection?

0 Answers  


what are the main differences of delta and star connection

5 Answers   Essar,


explain the application of reciprocity theorom

0 Answers  


why we use end termination kit for ht xlpe cables

1 Answers  


What is power factor ?What are the benefits of improved power factor & how. Please explain with examples.?

5 Answers   ABB,


How to calculate earth wire load by formula

0 Answers   Caparo,


what is the CT of protection and CT of metering ? what is class 5P10 & 5P20 and class PS ?

16 Answers   JEE Main, ONGC, VRA,


what is the reactive power what is the use of it in system

0 Answers   L&T,


WHAT MEANT BY MCC PANEL?

4 Answers  


can u tell me the promotion from oiller to enginer

0 Answers  


EXPLAIN WORKING PRINCIPLE OF ALTERNATOR & MOTORS.

2 Answers   L&T,


generator(Deutz 550kv)is runing for 2 hours with load of 900 amp and then it goes in shutdown with alarm fault messege of speed fault although heirtz reading fixed at 50,what does that mean

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)