Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how do we fix the rating of mcb required for a specific
capacity of the electric motor

Answers were Sorted based on User's Feedback



how do we fix the rating of mcb required for a specific capacity of the electric motor..

Answer / kali krishna

MCB Rating = 3* Full Load Current of that Motor, calculate the full load current by taking the hp Rating of that particular Motor.

Is This Answer Correct ?    2 Yes 0 No

how do we fix the rating of mcb required for a specific capacity of the electric motor..

Answer / b soni

calculate the line currant of motor if it it 25A

phase cuurant = line currant/1.73

get the mcb of phace cuurant's rationg

25/1.73= 14A
get the mcb of 15A

Is This Answer Correct ?    3 Yes 2 No

Post New Answer

More Electrical Engineering Interview Questions

why PT transformer primary r the grounded?

2 Answers   L&T,


Which type of motor is used in trains, what is the rating of supply used explain working principal?

0 Answers  


What is the difference between single phase, 2phase, and 3 phase motors?

2 Answers  


The formular of how to calculate a cross sectional cable to feed an electric motor. Examle: 15KW, 26.1A, 415V. Calculate the cable size in mm2

3 Answers   Sona,


what is the primary current in 415/415 v when secondry of dry type transformer is shorted.?

3 Answers  


respetsed sir, i have applied for section engg and juniour engg for both chennai and tiruvunabthapur boards for electrical deportments . can u suggest what books i have to follow and and also from which sections they r going ask (i mean weightage and what topics i have to cover) for both se and je for both chennai and tiruvunanthapur boards.......

1 Answers  


When alarm is activated in buccholz relay in transformer

1 Answers  


Define settling time.

0 Answers  


what is power system transient condition

1 Answers  


WHAT IS THE REASON FOR THE GROUND PIN IS BIGGER IN SIZE COMPARING TO OTHER PINS?

13 Answers  


what is CRGO Transformers?

6 Answers   MSETCL Maharashtra State Electricity Transmission Co Ltd, TATA,


I have made a 3 phase thyristor full bridge rectifier. But at the moment it is working only for the half bridge operation. Both the half bridges are on operation separately but when i put it into full bridge operation the oscilloscope output is zero. I rechecked that the pulses are correct for each thyristor. what could be the possible reason for this?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)