How to calculate the quantity of cement in Cement Mortar M10
Concrete using 40mm metal
Answer / sjtbehera
M10- 1:4:8
Cement = 15.2/1+4+8=1.17 cum
3.4 bag
Sand- .46 cum
Agg. - .92 cum
| Is This Answer Correct ? | 6 Yes | 9 No |
As column is compression member then why we use steel to make it reinforced as it is already capable of taking compressive load?
2 Answers MBL Infrastructures,
how to creat mix m-20? and how to check shuttering & how is mark layout at open ground
Can a 24" RCC beam can rest on 18" RCC beam.
what is the diffrence between Specific gravity & Density??
What is Architect-Prepared Contract?
limit value of bulking of sand
how many bricks required for below volume 1. depth filling 0.00 Qty 1.61 & Unit Cu.M 2. D-Filling 300 Qty 2.0 & Unit Cu.M 3. D.Filling 450 Qty 2.24 & Unit CU.M 4. D-Filling 600 Qty 2.44 & Unit Cu.M
How to convert aggregate and sand from kgs to ltrs ?
WHEN BRICK SIZE IS 3X5X9" , WHAT WOULD BE THE NUMBER OF BRICK REQUIREMENT FOR 100 SQFT AREA OF 5" width?
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
why are you joining in this (applied post) job and your aim for this job
What is bmc stands for in bmc software?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)