how to calculate quantity of steel in a slab , coloumn and
beam
Answer / islam alam
According to thump role. Slab 0.75-2%. Beam 1. 5- 2%. Column 1. 5- 4%
| Is This Answer Correct ? | 2 Yes | 2 No |
what is the theoritical percentage of concrete cubes testing per day?
what are the standard & nominal size of brick
What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.
0 Answers Krishna Constructions,
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
what is mean by c32/40s concrete class
how to test the quality of bars???
how many grades in concrete? list out
When column of building is abutting the boundary line,then suitable footing advised is
what"s the merits and demerits of hollow blocks comapre than to bricks?
How many steel is require in one cubic meter area?
A bill was raised by contractor which read as follows 1.) Excavation in normal soil upto 1.5m - 250 cum 2.) Excavation in normal soil 1.5m to 3m - 240 cum 3.) Excavation in soft rock - 350 cum 4.) Excavation in hard rock - 250 cum 5.) Filling with available soil - 825 cum 6.) Filling with bought out soil - 1100 cum How can I verify the above quantities, especially for item no. 5 & 6? What checks are necessary before releasing the bill ?
Define mirror?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)