How to calculate the quantity of cement in Cement Mortar M10
Concrete using 40mm metal
Answer Posted / sjtbehera
M10- 1:4:8
Cement = 15.2/1+4+8=1.17 cum
3.4 bag
Sand- .46 cum
Agg. - .92 cum
| Is This Answer Correct ? | 6 Yes | 9 No |
Post New Answer View All Answers
Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????
What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
what is labour consume factor in residential projects
How many pyramid in egypt?
what is the type of earthing
residential buildings,mixing of concrete,structural,construction material,site handling.
what is castigliano theaorem
how gradation of aggregates effect on slump of fresh concrete?
what is the use of beam end forces while using a staad ? wha they are show
how to calculate the concrete mix m30 by volume
In case if concrete box girder bridges how is the number of cells determined?
what is the design procedure for building
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
do we decide reinforcement steel , based on bending moment ? give example with continous slab?