what are the Cement Coefficient for Block Work & plastering
Work?
Answer Posted / ballal
Siporex Block Work has 0.18/sqm of cement consumption whereas
Plastering Work
a)External Plaster 1st coat 0.13/sqm
b)2nd coat comprising of 0.08/sqm,
c)Internal Plaster has 0.13/sqm.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
How to calculate the cement plastering for circular and rectangular water storage tanks and how to calculate the area of circular and rectangular floor?? Please help me
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
Difference between pre-tensioning and post-tensioning.
What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?
How to calculate thickness of MAT slab & Reinforcement? The dimention of under ground water reservoir is 80'X14'X 12 ft
What is the difference between one-way slab and two-way slab?
What Are The Different Type Of Slump Test Indications?
How to construct a water sump in a rocky soil?
Define different types of roof systems?
Which are the Steel tests ?
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
sir how can we find the cement and sand required for making 4" drop
why the openings of sieves are square io size?
How is make concrete cube?