On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
No Answer is Posted For this Question
Be the First to Post Answer
how much quantity of cement(bags)concrete(20mm)and sand(sqft)is used in 1:3:6 PCC
what is the construction cost for per cft of multistorryed building in kolkata?
Hi, Please tell me the ISI specification for the duration of concrete to achieve full strength of concrete. Is it 28days?
the bubble tube parallel to the telescope of theodolite should be more sensitive since it controls a. vertical axis b. horizontal axis c. axis of bubble tube d. none of this
What is density of crush sand and fine aggregate
What is the crank length in the slab?
What is stripping?
100sqft of 9" (brickwork).. bricks(standard)=no ? sand= cement=
what is meaning of AWS Welding procedure
I'm puting roof slab M20 Design Concrete,Twoway slab how many days wait for remooving of shuttering?
how to estimate shuttering form work or how to take off material quantity???
what is a minimum strength recommented for aerocon blocks?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)