On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
No Answer is Posted For this Question
Be the First to Post Answer
I want to change job.If You have any vacancy please contact me in this mail id-parthamitra086@gmail.com.Myself partha mitra.Diploma in civil engineer with 4+ yrs. exp.Now in kolkata.If you confirm me then I will send my detail resume to you.Also send your mail id to me.My mail id is-parthamitra086@gmail.com.I will be very much thankful to you.
What is the difference between gray swr pipe & red swr pipe
why demand factor less then 1 ?
need to join coaching institute in coimbatore tamilnadu ......say me the best coaching for IAS
Explain major difference between auto level and dumpy level?
what is ment by surveying?
Differentiate first angle & third angle projection?
How to calculate the thickness of the rcc slab?ll u pls tell the formula?
What the advantages and disadvantage of using 90mm and 100mm bricks for a wall of a house? Thanks for any input.
how to determine the foundation footing reinforcement spacing
how we calculate the vol.of wet concrete..?
What is GSB gradation
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)