how to calculate rate analysys of 1:6 plastering 10 sq m
No Answer is Posted For this Question
Be the First to Post Answer
how to calculate of m20 c.c road work 1cu.m
What is the maximum crushing load in Kg & crushing strength in N/mm2 for M25 & M 15 Grade concrete
1 Answers ECR, RRB, Si Precision Moulds,
Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?
Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.
what is the creep in concrete
what are the proper pipes for salt water line
calculation of quantities of cement and sand in 1cum mortar with 1:6 ratio
give me an example of a time when you had to explain some new procedures to your co-workers for quality service delivery, how did you go about it?
calculate the cost for AAC block wall of 15cum?
how to take quantity in triangle section for calculating tender purpose
concrete strenght is increased if using sisal fibre in concrete?
how do we calculate the quantity cement,sand, & aggregate for M20,M15 for 10cum.
7 Answers Opera, Raheja, Star,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)