How much quantity of steel will be used for commercial
building consists of ground floor shops, first floor shops,
second floor will be for offices and third floor will be
office/banks. How many tons of steel is required to
construct this building.
Answer Posted / asc
14 tons in general for 4 storeys at 1200 sq ft/floor area
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
why demand factor less then 1 ?
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
material used for mendrel use to bend epoxy coated rebar
types of survey and levelling instrument ?
How to calculate quanty of steel in four leg stirrups?
What is the different type of slump test indications?
Calculation of curtain wall of box culvert
do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?
How does a traffic light signal work ?
acceptance criteria for concrete works
how many mason and labaur work for a 1 brass bricks plz let me know the calculate & how to made calculation for this and whats the formulas for this?
How to activate isometric axes in cad?
Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com
what is difference between GTS bench mark and temporary bench mark
calculate the quantity of water for 1:6 cement mortar