how to calculate the quantity of plaster.
Answer Posted / ashis malakar
area x thickness of plaster = total quantity of plastering.
1m3 plaster = 2200 kg (weight of plaster)
taking proportion of cement and sand ,calculate the quantity
of materials .
| Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
for pretensioning which will yield first and same for post tensioning?
IS code for Rolling Margin of steel
What is Grid floor and mention its advantages ?
What is passive earth pressure ?
Which ratio use for cement selery???
Would you cause a 55-gallon drum of water to weigh more by climbing in?
what is cross hair cursor?
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force
How many % we consider for lap for reinforcement for estimates
all technical question
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..
How to build the floor to ceiling bookcase?
what is difference between fluidity and workability also how palsticizer works