how to calculate no. of bricks for 1 cft?
how to calculate cement and sand in cft?
Answers were Sorted based on User's Feedback
Answer / shamsul arefen
What is .5,.08,.33.Do any one inform me? Please....
nadim shaikh
| Is This Answer Correct ? | 0 Yes | 0 No |
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
0 Answers College School Exams Tests,
How to calculate the quantity of brick or mortar in m3. like in 1m3 brick =....no. .......mortar=....m3
what is the weight of 1 meter iron road if its diameter is 20milimeter. 2.when we find the weight of 1meter iron road we help the following formula dxd162 .what is 162 plz tell me
what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon
If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in
which red: used in roof teping, then use only cement
extra how much quantity need to fill the actual excavated quantity.
How to find CN by using arcgis 9.3?
what is mean by k150
What is the distance between railway tracks?
what do you mean by 'redistribution' of forces?
What is Leastcount of 1. Total station 2. Theodolite 3. Dumpy level 4. Plane Table
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)