how to calculate no. of bricks for 1 cft?
how to calculate cement and sand in cft?
Answer Posted / nazmul
1/.83*.42*.25=11.47
| Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
Describe a time when you anticipated potential problems and developed Preventive measures
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?
what is the design procedure for building
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
What is the difference between EPC,DBOOT and BOOT.
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
what is density of 20mm coarse aggregate.plz send answer my below adress e.mail
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
How is calculate the cube molt
How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.
What is a tensile strength? What is the tensile strength of wood?
satart to end steps by step process of building construction...? i want to planning theme accuretly
Why concrete barriers have curved surface profiles?