what is the difference between pumpable concrete and non
pumpable concrete
Answers were Sorted based on User's Feedback
Answer / balamurugan r
In order to pump a concrete using pump machine to place it
in the final position, it should have the following properties,
1.It should be M20 grade or higher
2.It should have high workability say slump value 90-120mm.
3.It should have well graded aggregates and more cement content.
4.Minimum cement content for this kind of concrete will
around 325kg/cum.
Is This Answer Correct ? | 7 Yes | 3 No |
Answer / lalit madnawat
Pumpable concrete means
easy to workabale /having
high workability.
&
non pumpable concrete
means hard to workable/low
workability and low w/c
ratio.
Is This Answer Correct ? | 4 Yes | 0 No |
Answer / er. amar
Pumpable concrete means the concrete mix having small size
of aggregates and having proportions of water and cement mix
in proper quantity but non pumpable has big size of
aggregates which sometimes during traveling through pipes
gets stuck at some place and due to which it creates problem
for concreting any structure.
Is This Answer Correct ? | 3 Yes | 3 No |
Answer / ganesh
Dear one,
We are using pump in some site where we can not transit the material(concrete)l to work place, concrete used pore in the pump machine and transit rcc via pipe,
slump value should be 120mm minimum for Rcc workability,
Is This Answer Correct ? | 0 Yes | 0 No |
How to find quantity of cement bags, sand, coarse aggregate, from 1m3 of concrete of m20 design?
how many shuttering material required for 1000 sq.m built up area.
What is difference between target mean strength and compression strength of concrete?
how to take concrete quantity for precast segment for viaduct project?
Where hinge support is used in residential building?
different type of beam
1m3 3/4 inch course agreegate concrete is which m3 of agreegate ?
In 120 m high RCC Chimney shell construction how we can calculate the inner and outer dia of shell at every +1 m level as this shell is inclined from bottom to top.
curing of concrete why 7day's,14day's 21day's 28days
methode of psc girder stressing
how material can be calculate for brick work in 1:6
How to identify the vitrified tile and ceramic tile by observation only after executing the job.