Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What is the formula to calculate the volume of mortar
required for a wall with 1245 blocks with a stndard size of
440x215x100?

Answers were Sorted based on User's Feedback



What is the formula to calculate the volume of mortar required for a wall with 1245 blocks with a ..

Answer / aabid

3.32 m3 use mortar volume

Is This Answer Correct ?    0 Yes 0 No

What is the formula to calculate the volume of mortar required for a wall with 1245 blocks with a ..

Answer / sjtbehera

Please obtain length of wall. Then you calculate cum. Then mention ratio of mortar. Add 15% more to mortar fpr wastage and gap filling. Divide to cum obtain obtain cement.

Is This Answer Correct ?    0 Yes 2 No

Post New Answer

More Civil Engineering Interview Questions

what is the meaning or full form of 12T13 cables used in prestressed bridges

1 Answers  


I'm preparing to to build a simple house, but i don't know how to calculate how much cement, gravel and sand and hollow blocks i need to prepare. How many pcs of 4" or 6" hollow blocks I need for my planned 3mx6m house? thanks. 

0 Answers  


what is the service corridor?

0 Answers   NCC,


Can we use PPC AND PSC CEMENT FOR MIX DEIGN?

1 Answers   IVRCL, Reward Constructions,


Why did you choose this career?

3 Answers  


How to calculate measurement box size for M25 grade cement?

3 Answers   Perunding Omega PMC,


What are the RISKS during the project construction?

0 Answers  


please differentiate duties and responsible for civil site engineer , Quantity suryevor ,Quality control engineer and Planning engineer

1 Answers  


Soil is clay

2 Answers   L&T, NBCC,


after temping in cbr mould keep how many hours mould in water

2 Answers  


How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57

0 Answers   Apex,


how much of the strength comes from post-production curing

0 Answers   Focus Energy, L&T,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)