What is the formula to calculate the volume of mortar
required for a wall with 1245 blocks with a stndard size of
440x215x100?

Answer Posted / sjtbehera

Please obtain length of wall. Then you calculate cum. Then mention ratio of mortar. Add 15% more to mortar fpr wastage and gap filling. Divide to cum obtain obtain cement.

Is This Answer Correct ?    0 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is diffrence between catchment area,watershed and basin?

2500


how do you stabilize a waterlogged area in road construction

6314


What year was the keystone power plant in Indiana County constructed?

735


1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.

2313


How long does it take concrete to harden?

670






How many are the types of joints?

692


How many feet are in 4 square yards?

729


The 4 main factors to start a construction project are––

1796


what are the changes in concrete pour height as per IS 456, 2009?

2713


Trapezoidal section footing calculation of Volume & its Area

32026


what is mean by c32/40s concrete class

1336


How many axes do cartesian coordinate system has?

660


how to calculate the size of triangular ring in rcc column?

1358


5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?

8493


the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C

1578