what is the procedure for batching plant calibration??????
Answer / sjtbehera
You go through manual because it is technical collabration with machine
| Is This Answer Correct ? | 6 Yes | 2 No |
the volume of 50kg bag is 27 lit 24.7 lit 44.7 lit 42.9 lit
How much overlaping required for welding the reinforcement bars in Columns & beams
there is a residential building L = 20' B = 30' H = 20' stairs L = 3' H = 20' calculate the numbers of Threads and risers from stairs with formula
tell me quantitys of matal, sand and cement in 1:4:8 and 1:2:4
9 Answers AVL, Infosys, NCC, SPCL, Swapnapurti Developers,
What is mean by ITP in a construction project
In 250x250mm cube, how much there will be cement,sand,water,and gravel
HOW MANY CEMENT BAGS ARE REQUIRED IN 1 CUBIC METER
11 Answers Bharat Construction, CPWD, Ircon,
Types of column foundation and how to calculate its steel quantity.
what will be the difference in compressive test results for a 150 mm cube, a 150 mm cylinder and a 300 mm cube
first wt is reqd. for making a mix design of concrete & the procedure of determining the qty. of material used in concrete.
WHAT IS DIFFERANCE BETWEN TOR STEEL AND TMT STEEL
what r you reqired for concrete baching plant?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)