How many bags required for 1cum grouting?

Answers were Sorted based on User's Feedback



How many bags required for 1cum grouting?..

Answer / vijayakumar

If you are using 25 kg bag of grouting material,it will take approx.80 bags

Is This Answer Correct ?    127 Yes 21 No

How many bags required for 1cum grouting?..

Answer / sanjay kale

88.8 bags required for considering density of GP 2 Conbestra is 2220 kg / Cum

Is This Answer Correct ?    62 Yes 5 No

How many bags required for 1cum grouting?..

Answer / vinod

For Normal Neat Cement Grouting - 44.06 bags of Cement
For Non-Shrink Grouting using GP2-Compond - 2200kg of GP2

Is This Answer Correct ?    35 Yes 5 No

How many bags required for 1cum grouting?..

Answer / kailash sapkal

84 bags required for 1m3

Is This Answer Correct ?    31 Yes 15 No

How many bags required for 1cum grouting?..

Answer / sadham

96 bag are required for 1cum concrete (25kg/bag)

Is This Answer Correct ?    3 Yes 4 No

How many bags required for 1cum grouting?..

Answer / krishan kumar

depend on bag

Is This Answer Correct ?    7 Yes 14 No

Post New Answer

More Civil Engineering Interview Questions

what is the use of water bar in water tank and is this an extra item in estimate?

0 Answers   PS Constructions,


What is Current Shuttering rate (labour + materials) for Columns, Beam & Slab on Item rate basis ?

3 Answers   Atul, AVR, Pioneer,


What is logic behind the use of Steel bar insted of gold bar?

10 Answers   Rites,


What is Rankine Cycle?

0 Answers   Bechtel,


can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now

0 Answers  






how many nails required in one sqm shuttering.

1 Answers   BCL, Era Infra Engineering, KR Traders, Sai Foundations,


advantage and dis adventagesof using crusher dust insted of sand in rcc works

3 Answers   Descon, DLF,


Why did you choose to be an civil engineering

16 Answers  


as we take 30% of whole brick work masonry ,so how much % we take in block masonry?

1 Answers   azan,


Is there a necessity for providing expansion joints in long RCC structure(say a wall of a water retaining structure)- say approximately 50 metres in length and about 4 metres high? What will be the limitations?

2 Answers  


what is the stripping time of beam column & slab?

2 Answers  


What are new methods /technologies of pothole patching?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)