I am planning to construction in my plot in Pune (Chandan Nagar) and its near about 1950 SqFt. Can some plz help me on the rate on per sqft for RCC,Brickwork & Plaster,Flooring,Water proofing,Door. Thank you in advance
in staad ,why we realease a moment of a member ? what is affect if we realease a moment
where vr providing singly reinforced beam. i want to know the location of it in a building
What is the purpose of Chipping in the heavy foundation?
What is the actual formula to calculate dry consumption of 1cubic meter m20 Concrete???? Plzz tell seniors it is urgent..
how much M-25 steel reinforcement per cubic meter in commercial building as per IS code
what is the types of door's wood?
resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil
I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,
where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?
sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.
What is meant by engineering drawing?
what is formula for concrete mix ratio in m20, m25 and m30?
2 Answers Reddy Veeranna Constructions,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)