Why shear forces are usually neglected in column design?
Answer Posted / mohd ahmad
Because column is the
compression member
| Is This Answer Correct ? | 11 Yes | 0 No |
Post New Answer View All Answers
Can a wave happen in the middle of the ocean like in the movie poseidon 2006?
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
How can you produce desired alloys and discuss their applications in daily life.
CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL
What is the strongest bridge for a school contest?
What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?
How to compute minimum number of columns required for a site from area of site?
What is the thickness of slab for 600 sq each) 2 slab construction. What should be the size of steel rod?
"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.
What is the use of extruded feature in solidsworks?
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].
How much material is required for constructing a 2 Lane 2Km rigid pavement road
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item