In BBS,Find out the cutting length for a 2000*2200 column with 50 mm cover?
Answer / mukesh mani
8000+24d or 8000+20d (Where d is dia. of bar)
Is This Answer Correct ? | 0 Yes | 0 No |
What is the density of cement?
why development length = 50D . why not 100D
What should be the Min.Penetration in a hard rock for all pile diameteres?
1) one brass of stone aggregate 20mm is good for how much sq.ft. work of concrete beam and 2) one brass of river sand is good for how much sq.ft. work of concrete beam . if ration is 1:4:6. at the same time how many bags of cement will be required for same work if each bag is of 50 kgs . please help me.
What is the different type of slump test indications?
Why I-section is preferred to channel section?
what is density of 20mm coarse aggregate.plz send answer my below adress e.mail
0 Answers NG Constructions, Quaid-e-Azam International Hospital, Shafiq Constructions,
What is The meaning Of Auto cad And Also Define What Is Drawing According To You
1) why bent up are provided at l/4 or l/5 distance not at l/8or l/10? 2) why extras are provided in beams at top and why upto 0.3l distance max.? 3) why chairs are provided in two way slab?
pls can some one tell me details of coloumn shuttering like at what distance the supports should be palace and no. of supports
at what height brick masonr, block masonry & Concrete wall can construct in a day ?
can you provide a link for manual design of building?