in which code refer the change of reinforcement dia defer to
drawing . i.e. 12mm dai into 16mm dia.
Answers were Sorted based on User's Feedback
Answer / jayaraj
No need of any code reference for the diameter of bar we are using.We have to match the area of steel required.
| Is This Answer Correct ? | 3 Yes | 0 No |
please differentiate duties and responsible for civil site engineer , Quantity suryevor ,Quality control engineer and Planning engineer
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
Prepare a Schedule for a Highrised building from starting stage to Handover?
How do you to separate Marble and Granite. What are difference between them?
What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?
What are the strongest shapes in building?
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
what is cross hair cursor?
what is the difference between natural draught cooling tower and induced draught cooling tower
In jack arch floor, the rise is kept?
Define What is the best type of wood glue?
Why Vitrified tile are getting pop up.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)