How much Strength of the cube can attain in 7days
comparative 28 days strength?(as per IS code) ( specify the
ref.clause also)
Answers were Sorted based on User's Feedback
Answer / asif
After 7 days it should achieve 70% strength, and after 28 days it should achieve 120% strength.
Is This Answer Correct ? | 27 Yes | 8 No |
Answer / kumaresan
at Seven days, it should be 70% and at 28 days it should be
100%
Is This Answer Correct ? | 13 Yes | 1 No |
Answer / shri
at 7 days 2/3 of grade and at 14 days 1/3 of grade
Is This Answer Correct ? | 7 Yes | 3 No |
Answer / shalu verma
after 7 days it achieve 70% strenght bt after 28 days it
achieve 85% strenght.
Is This Answer Correct ? | 8 Yes | 5 No |
Answer / manoj kumar bhola
AT 7 DAYS STRENGTH WILL BE 67% AND AT 28 DAYS STRENGTH WILL BE 100%
Is This Answer Correct ? | 4 Yes | 1 No |
Answer / hemanta ku.das.(tuv-sud)
Sp-24,page no-20 ,give this formula to find out the different grade of concrete for different age
t
Ft = ............... *F28
a+ (b*t)
a=4.7,b=0.833. constant
t=time period,(days)
F28=grade of concrete.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / lalit kumar singh
Strength of cube in
07 days - 67%
28days - 85-90 %
Is This Answer Correct ? | 0 Yes | 0 No |
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
how many bricks are consumed for 01 Cum of brick work
Can any one give me any link to download civil engineering code in free ?
how to calculate unit weight cement ,water ,steel
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
if the slab is 2 way then,where we will put lapping upper and lower side?means near to beam or center and near to center?
1)pile is of 200mm dia.-- a)tell the cutting length of ring considering 2cm cover b) tell the quantity of concrete considering pile length as 3m c) tell concrete quantity in bulb
How much cement and water required for cement selery????
how to shuttering is used in slab
how to calculate the value of 162?
2 Answers GKC Projects Limited GKCPL, L&T, OPG,
How are freeway bridges built?
what is slope provided to floor?