why cutting length in design of beam is rounded more for -r/f
& less for for +r/f
Answer Posted / pavan sengar
Associate cement company
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
how calucate cement sand ratio for plstering
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
What are the benefits of rcc pipes over steel designed pipes?
is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.
Consumption of Binding wire for fixing of cover block in vertical surface
how to clculate the %of concrete strenght achive after curing?load
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
types of survey and levelling instrument ?
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?
how to find quantity of concrete in PCC M15
what r you reqired for concrete baching plant?
Which tests are performed on soil to decide the type of foundation to be provided.
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
Pls provide me with the calculation or codes related to de- shuttering of flat slabs
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.