what does 1 in 30 or 1 in 40 mean when constructing camber
in roads.
Answers were Sorted based on User's Feedback
Answer / saif
this is refer to slop, 1 stand for vertical & 30 or 40 stand for horizontal.
| Is This Answer Correct ? | 39 Yes | 1 No |
Answer / rafiya
In book it is mentioned that 1in 30 means for 30 m wide road the crown will be 0.5 m above the edge of the road
| Is This Answer Correct ? | 26 Yes | 10 No |
Answer / n rajesh guttedat
That is slope maintain in camber construction
| Is This Answer Correct ? | 3 Yes | 2 No |
What is differnce between founadation & footin ?
how many kilograms of binding wire in 1 kilograms of steel bars
how much cement is required for 100 sft plastering of ratio 1:4
6 Answers Confident Group, L&T, M N Creations,
Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.
what is relation between SPT N value and driving piles after conducting a soil test?
how to find the diameter of steel bar from steel area
Is 456 revised lastly in which year? & What are the revisions?
concrete coverings outside steel
13 Answers Jain Housing, L&T, Supertech,
How to calculate cement quantity in m20 concrete
2 Answers nnovative Constructions, Shapoorji Pallonji Group(SPCL),
Sir I am from jntuk R13 regulation...... Is there any chance to leave credits
What is kn measurement?
what is the sp.gravity of sand?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)