what does 1 in 30 or 1 in 40 mean when constructing camber
in roads.
Answers were Sorted based on User's Feedback
Answer / saif
this is refer to slop, 1 stand for vertical & 30 or 40 stand for horizontal.
| Is This Answer Correct ? | 39 Yes | 1 No |
Answer / rafiya
In book it is mentioned that 1in 30 means for 30 m wide road the crown will be 0.5 m above the edge of the road
| Is This Answer Correct ? | 26 Yes | 10 No |
Answer / n rajesh guttedat
That is slope maintain in camber construction
| Is This Answer Correct ? | 3 Yes | 2 No |
what is the yield strength of M30 grade of concrete
what are the minimum compressive strength required for the concrete cube for different grades & different days .Please give me an answer.
how much steel is required foe following components.. footing- plinth beam- column- beam- slab-
Which Cement is good for concrete, Is that grade 33, 43 or 53?
how many shuttering material required for 100 sqm
what do you calaculate PCC/GRADE 10
how can we calculate steel value, depending on load
why red bricks & cinders used in toilet sunken filling. if coarse aggreate used wat the probelem
Which code describes the tolerances limit for undulation in the roads or pavements ?
what is the silt(for sand) allowed persentage as per IS CODE B/W: PLASTER: CONCRETE :
in how much square meter of slab we are providing a beam it may be oneway or twoway slab.
What is bending moment
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)