what does 1 in 30 or 1 in 40 mean when constructing camber
in roads.
Answer Posted / rafiya
In book it is mentioned that 1in 30 means for 30 m wide road the crown will be 0.5 m above the edge of the road
| Is This Answer Correct ? | 26 Yes | 10 No |
Post New Answer View All Answers
what is the cost differene of a same structure when it is constructed with brick masonary, and when it is constructed with concrete as a frame structure.????????
How many bricks are there in 100cft?
how to calculate the length diamond shaped striupps in column
What do you understand by “preset” during the installation process of bridge bearings?
1) What is meant by C-soil in geotechnical Engineering? 2) What is Eve board? 3) What will happen when heat is applied to cement? 4) what do you understand by the lateral dimention ?
how to clculate the %of concrete strenght achive after curing?load
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
Aptitude, reasoning, quants, verbal and technical question
at which depth the construction of tunnel is economical from cost and engineering aspect.
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
What is the strength of 1:6:12 mix?
Describe the various methods of concrete curing?
Define What glue is least sticky?
give me the mix proportion for design mix concrete M 7.5 grade 1:4:8
Define What is the force exerted by the Tacoma narrows bridge?