what does 1 in 30 or 1 in 40 mean when constructing camber
in roads.
Answer Posted / rafiya
In book it is mentioned that 1in 30 means for 30 m wide road the crown will be 0.5 m above the edge of the road
| Is This Answer Correct ? | 26 Yes | 10 No |
Post New Answer View All Answers
During reclamation how can the occurrence of mud waves can be rectified?
density of crush sand & crush stone or grit powder
what isload waring calculation
what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.
why does the most of civil engg is not intersted to going for teaching field?
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
how do you stabilize a waterlogged area in road construction
What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code
Scaffolding IS code NO.
What is a projection line?
What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?
What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)
how to remove the quantity of metal 1 and metal 2 in concrete
whou haat goals do you have in your career
What Reinforcements Are Used In The Process Of Prestressing?