what does 1 in 30 or 1 in 40 mean when constructing camber
in roads.
Answer Posted / n rajesh guttedat
That is slope maintain in camber construction
| Is This Answer Correct ? | 3 Yes | 2 No |
Post New Answer View All Answers
we have a crushing plant and our product is experiencing flakiness and elongation over limit for granite. what is the solution to this problem? how can it be avoided and what to do differently? It is not ok for batching plants
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
what is the types of surveying?which type of survey carrying for type of work?
what will be price of 1:2:4pcc per kg?
what"s the sort of beams?
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having
Cement consumption of one cubic meter of aerocon blocks masonry?
if we use 1.25 bag of cement 3 pharma metal and 2 pharma crush sand what is the strenghtexpected for RCC column
what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..
Tell me about triple point of water.
What is the usage of zoom command?
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
where can i get the previous question papers for rrb section enginerr (civil)
What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?