what is the projected employment outlook for this carrer?
Answer / narsing (adarsh)
For civil engineers for next 5 years they have orientation
in planning,execution,analysis later they hve gud scope in
building operations and maintenance areas of industry so we
can have gud vision for next 25 years.
| Is This Answer Correct ? | 0 Yes | 2 No |
state the difference between direct and indirect cold water supply scheme
in the earthquqke the profile of water on dam is parabolic or not
As per IS 2502 2(A+B)+24d formula is given for stirrups detailing,but explination not given for how that 24d came
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
how to convert kg/m3 to cu ft
i want measure water capacity in 25'diameter and 7'height of water in circular storage tank in liters how?
what is scour depth $ what's the process to determine it?
How to calculate the capacity of Water tank?
Which brick is best for construction ,either fly ash or AAC BLOCKS
how much extra rod length should be provided for beam
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
appsc AEE'S interview questions wanted
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)