Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is assumption consumption of steel per m3 for raft

Answer Posted / dandamudi tanuj

Min of 100kgs steel is assumed for 1 m3 of concrete. As per the standards of IS456-2000 unit weight of pcc is assumed as 2400 & unit weight of rcc is assumed as 2500. As per these standards assumption of steel per 1m3 of concrete should me minimum of 100kgs.

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

An interior designer designed a rack with the given dimensions. The dimensions are in feet. This coplanar frame repeats at every 5feet and constitute a space frame. The total length is 120feet. Which steel member will you suggest? A square bar, A square tube or a circular tube. Explain.

2000


What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?

2234


20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u

2356


Is there the dry coefficient of cement is constant?

2284


What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.

4695


How to calculate the quantity of cement mortar 2" for mosaic tile fixing 12"x12"?

1753


Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3

2107


What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??

2368


Spider cracks occur in beam bottom due to––

2136


The portion of a brick cut across the width is called?

1576


How to identify the vitrified tile and ceramic tile by observation only after executing the job.

997


How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 600 microns?

6756


what are the duties of Site Engineer in work site?

1637


how is the reinforcement is distributed in triangular slab

2246


.5Ast

1788