what is assumption consumption of steel per m3 for raft

Answer Posted / dandamudi tanuj

Min of 100kgs steel is assumed for 1 m3 of concrete. As per the standards of IS456-2000 unit weight of pcc is assumed as 2400 & unit weight of rcc is assumed as 2500. As per these standards assumption of steel per 1m3 of concrete should me minimum of 100kgs.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why we create short columns under grade slab?

1842


Cement consumption of one cubic meter of aerocon blocks masonry?

3669


What is packing Factor ?

994


What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?

1170


is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.

1577






As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low

1067


to draw bm diagrams for portal frames under different loadings//

2438


What you understand by richter scale?

710


how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing

1828


For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate

1166


What is need for setting limits?

652


If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?

1712


What are the common ways of demolition?

722


What is meant by cad?

649


How cracks in concrete can be avoided?

644