Answer Posted / sjtbehera
this is easy method . lenhth x breadth x height.
calculate it and amount is in cum.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What is meant by autocad?
Which IS Code/American Code applied for coupler test of steel
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
How to increase a bearing capacity of soil?
Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa
why development length = 50D . why not 100D
How to calculate woden area in sft and Cft
in the construction of residential building what type of tank are used?where?why & what is its purpose?
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
How do you change a dimension value in solidsworks?
In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.
how to calculate the steel in 500yard
How much cement,sand,bricks and water needed for 1square metre brick work?
How do we test on design and style in a software?