Answer / ziyad
there is no engineering reason for that.
the reason is economical.
since they start generating by three phase and the following
designs was based on the first models, and it is difficult
to change the system that already exist so they continue to
design three phase generators and transmission systems.
| Is This Answer Correct ? | 5 Yes | 6 No |
Answer / ben
IN CASE OF 3PHASE SYSTEM,LENGTH OF CONDUCTOR NEEDED IS LESSER,,ALSO REGULATION IS GOOD IF WE USE 3PHASE..
| Is This Answer Correct ? | 0 Yes | 1 No |
Answer / manikandan
3 phase system generating & transmission is economical,all
the machinerys are working in 3 phase supply ,so why to
generate 4 phse& 5 phase,if generate 4phase the
transmission &distribution is very difficult
| Is This Answer Correct ? | 1 Yes | 2 No |
Answer / ganesh
because the 3 phase
tends the 120 deg
phase sequence to
the high loads
| Is This Answer Correct ? | 1 Yes | 4 No |
Answer / ashok mishra
because it is easy as generate as of 120 degree angle
| Is This Answer Correct ? | 1 Yes | 5 No |
Answer / deepak24
it is because three phase system is most efficient system.
| Is This Answer Correct ? | 5 Yes | 10 No |
What is the use of insulation tester and how it is to be used.
explain impact of tariff on energy management..? and what is ABT tariff
ups battery design formula
What is the difference btwn grounding and earthing?
How to calibrate or test an LT Air Circuit breaker 440 volts, 35 KA, 800 Amps ?
We have given to 3phase supply to ups system & how can coming netural
If a ACB breaker is tripping and closing problem, then what will we check internal..?
What is differential relay? How it operates?
What are all the problems occured while ac generator running in leading power factor at full load condition?
If the capacitor bank is installed in switchyard say 132/22kv then on LT side say 22kv/0.433kv is it necessary to install capacitor bank for maintaining power factor. if pf is maintained on HT side then will that be maintained on LT side as well.if not then how&why??????/ please explain...........
What is mean by vector group? For what purposes we doing vector group test in transformers?
long form of CT
3 Answers MSETCL Maharashtra State Electricity Transmission Co Ltd,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)