07. 4 main points about check list for rebar works are–
––
Answer / rv
1-Check the number,length,spacing,location and dia of the bar
2-check the development length(ie 50D)
3-Check whether proper clear cover is there at side,bottom and top.
4.Check the alignment (verticality/horizontality) of steel
| Is This Answer Correct ? | 4 Yes | 0 No |
Please let me know the name of university which is offered distance education in BE or Btech in direct 3rd samester????
what is the weight of concrete for 1 cum?
15 Answers Dhenu Infrastructure, L&T,
How to convert n/mm2 in to kg/cm2?
38 Answers Rvr Projects Pvt Ltd, Soma Enterprises, Unitech, Wipro,
what is tie beam? & its function . uses of tie beam.
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
calculate 1-2-4 ration concrete - cement - sand metal and water required for 1 cum
What is difference between limit state and working stress method? How it is applies in building structure.
how much cement consumption in box type waterproofing
can stub column take the load as main column
what is the exact dia of 8swg and 10swg gabion wire
Middle point of any slab is raised 10-12 mm during shuttering work because––
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)