07. 4 main points about check list for rebar works are–
––
Answer Posted / rv
1-Check the number,length,spacing,location and dia of the bar
2-check the development length(ie 50D)
3-Check whether proper clear cover is there at side,bottom and top.
4.Check the alignment (verticality/horizontality) of steel
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
what post do you prefer to work in this company and why do you think you can serve better in such position?
Why should you show Client/Engineer activities clearly on the project plan?
Rate analysis of Vitrified tile in cement mortor 1:3
What is the difference between one-way slab and two-way slab?
what do you know that m20,m25
16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.
Laying bitumen concrete 40mm thick using 0.1372 cum of 13.2 10mm metal ,0.2387 cum of 10 5mm metal...what did it means please explain me how much cum of 10 mm metal need?
define the strength
how to conversation of all construction material in to brass
What type of tensile strength is handling by crank in beam? Thanks.
How to calculate Cement in bags ,sand in sqft and aggregate in sqft for 1cum M25 grade concrete
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
Why nautical mile is different from statute mile?
what are the proper pipes for salt water line