Ratio of cement : sand for fixing slab and tiles in the
floor and also quantity of cement and sand requires for
laying slab and tiles separately (area 100 sq. ft)
Answer Posted / md. mainul islam
Ratio=1:4
Cement:1.5 Bag
Sand: 7.5 cft
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.
what is difference between GTS bench mark and temporary bench mark
Critical Path Method is...
Sometimes the side of concrete bridges is observed to turn black in color. What is the reason for this phenomenon?
What is the cemnent ratio
how to caluclate sienerge qty in construction in ap
Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?
a) Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing
What is the usage of zoom command?
What are the basic use of runners and standards of pipelines?
What are the techniques to measure road difference?
What are the uses of groynes?
What is the Maximum %age of Steel in columns and beams ?
How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel
how to identify np3 pipe and np4 pipe